WORK PERFORMED EVIDENCE
This document summarizes the technical work performed on Tom Ronnkvist's Welder Control Project.
Hardware Integration:
• Replaced failing ISA controller card (March 2024)
• Installed replacement Pentium II system with ISA slots (May 2024)
• Integrated existing ISA cards and drive into new system (May 2024)
Software and Configuration:
• Cloned original hard drive image to new system (May 2024)
• Attempted virtualization using USB-to-ISA adapters (May-July 2024)
• Restored system from backup after HDD failure (September 2024)
On-Site Services:
• Multiple diagnostic visits to Tom's location (April, May 2024)
• Coordination with MTI technician (May 2024)
• Continued support and troubleshooting throughout project